During the Preliminary Economic Assessment (PEA), a greenfield gold flotation plant with a carbon-in-leach (CIL) circuit to treat the gold concentrate and flotation tailings, and a separate heap leach operation, was investigated. The PEA also included identifying the associated infrastructure to support the mine and process plants.
Lycopodium’s scope included the provision of engineering and study management services to prepare a PEA NI 43-101 Technical Report including development of conceptual engineering to support the capital and operating cost estimate.
Project features:
The largest undeveloped gold resource in Atlantic Canada.