The existing chlorinator injection systems at the Lang Lang and Frankston South water treatment plant sites no longer met SEW’s operational requirements, having reached their end of service life. SEW required replacement of the old systems with the latest state of the art dosing facilities.
Lycopodium partnered Jonoco in investigating the template of future chlorinator upgrades. Lycopodium produced the design and process control documentation for the existing Bunyip and Koo Wee Rup Chlorinators. The investigations at Koo Wee Rup and Bunyip were then used to create a Basis of Design document for the Frankston South and Lang Lang sites.
While Lycopodium undertook the detailed design, Jonoco was responsible for undertaking the procurement, site installation and construction, and commissioning works. Lycopodium also provided technical assistance during Jonoco’s site works.
Jonoco with Lycopodium continue to tender on future upgrades of South East Water’s Chlorinator using Lycopodium Design and Process Control documentation.