Commissioning to stage C4 was achieved in April 2024.
ADP provided design, supply, installation and commissioning services for the project, encompassing the design and supply of key components, including the grizzly feed hopper and run-of-mine (ROM) load tip, variable-speed driven belt feeder and conveyor and screening module.
The scope also included the provision of non-process infrastructure, including a containerised motor control centre and control room building.
ADP will return to site to complete commissioning to stage C5, once the client has secured sufficient ROM material to commence operational ramp up.