Lycopodium was responsible for detailing the grain intake and milling part of the process, Australianisation of the facility design, and detailed design of the civil and structural work, buildings, pipe bridges, road works, underground services, tank farm, loading and unloading facilities, ethanol/denaturant bleeding and all utilities.
Lycopodium was also responsible for procurement assistance of all process equipment and utility plants with the exception of distillation columns, evaporation and shell and tube heat exchangers.
Lycopodium provided engineering and procurement services for the construction of this plant to produce 100 Ml/year of fuel-grade ethanol, based on technology provided by Praj Industries Ltd.