Phase 1 of the development consists of an open pit mine and a 3,000 tpd processing plant with conventional crushing, grinding and flotation circuits.
Lycopodium provided Feasibility Study (FS) engineering services for the processing facility. This included developing flowsheets at Preliminary Economic Assessment (PEA) level to support the establishment of capital and operating expenses for the processing facilities.
The scope included reviewing the previous work and development of an optimized flowsheet and then updating the previous FS based on this.